Tag: Shared Use Path

  • TZ Bridge Bike Path Files from the NYS Thruway Authority

    TZ Bridge Bike Path Files from the NYS Thruway Authority

    Construction started on the Gov. Mario M. Cuomo Bridge, better known as the Tappan Zee Bridge (TZB), in 2013 and opened to the public on 8/26/2017. The bridge includes a Shared Use Path (SUP) for bicyclists and pedestrians, which opened on 6/15/2020. The surfacing of the SUP consists of approx. 1.5 inches of “thermoplastic polymer…